Boggy Creek Road Project

Share Boggy Creek Road Project on Facebook Share Boggy Creek Road Project on Twitter Share Boggy Creek Road Project on Linkedin Email Boggy Creek Road Project link


This project involves widening Boggy Creek Road from 2 lanes to 4 lanes, stretching from Simpson Road to Narcoossee Road, covering a distance of approximately 5.9 miles. The study and final design plans can be viewed from the Documents section of this page.

This project includes

  • Accommodations for different modes of transportation, based on the Project Development & Environment (PD&E) study findings
  • Improvements to drainage systems and storm water ponds
  • Modifications to signalized intersections at Nele Road, Turnberry Boulevard, and CR 15 (Narcoossee Road)
  • Upgrades to the Intelligent Transportation Systems (ITS)
  • Modification / replacement of the triple box culvert over Jim Branch Creek
  • Street lighting

For construction alerts, please visit www.osceola.org/go/trafficalerts.

Project Schedule

Click to enlarge




This project involves widening Boggy Creek Road from 2 lanes to 4 lanes, stretching from Simpson Road to Narcoossee Road, covering a distance of approximately 5.9 miles. The study and final design plans can be viewed from the Documents section of this page.

This project includes

  • Accommodations for different modes of transportation, based on the Project Development & Environment (PD&E) study findings
  • Improvements to drainage systems and storm water ponds
  • Modifications to signalized intersections at Nele Road, Turnberry Boulevard, and CR 15 (Narcoossee Road)
  • Upgrades to the Intelligent Transportation Systems (ITS)
  • Modification / replacement of the triple box culvert over Jim Branch Creek
  • Street lighting

For construction alerts, please visit www.osceola.org/go/trafficalerts.

Project Schedule

Click to enlarge