Osceola County invites you to the Proposed Turnpike Mainline/SR 91 and
Waterlin Boulevard Interchange Project PD&E Public Meeting
Date: Thursday,December 3, 2026 Time: 5:30 pm - 7:30 pm Location: St. Cloud Community Center 3101 17th Street, St. Cloud, FL 34769
Proposed Turnpike Mainline/SR 91 and Waterlin Boulevard Interchange PD&E Study Project Description:
Osceola County is conducting a Project Development and Environment (PD&E) Study for a proposed interchange at Florida’s Turnpike (Mile Marker 234) and Waterlin Boulevard. This study will evaluate a phased approach to interchange implementation. The purpose of this PD&E is to evaluate and provide a new local access connection to accommodate existing and future transportation demand, enhance safety and connectivity between the Turnpike and the planned local roadway network, and improve travel time reliability. This project will also provide additional access to the Turnpike for emergency responders and evacuation operations for surrounding communities.
Phase 1 of the project consists of a northbound entrance ramp from Waterlin Boulevard to SR 91/Turnpike, a southbound exit ramp from SR 91/Turnpike to Waterlin Boulevard, and supporting roadway, drainage, traffic, control, lighting, intelligent transportation services (ITS), signing, utility, and other necessary infrastructure. Phase 2 is anticipated to include future south-facing ramps, consisting of southbound and northbound entrance ramps. The PD&E Study will involve a wide range of engineering assessments, environmental analysis, and public involvement to identify alternatives that meet the project needs.
Project Schedule:
Osceola County invites you to the Proposed Turnpike Mainline/SR 91 and
Waterlin Boulevard Interchange Project PD&E Public Meeting
Date: Thursday,December 3, 2026 Time: 5:30 pm - 7:30 pm Location: St. Cloud Community Center 3101 17th Street, St. Cloud, FL 34769
Proposed Turnpike Mainline/SR 91 and Waterlin Boulevard Interchange PD&E Study Project Description:
Osceola County is conducting a Project Development and Environment (PD&E) Study for a proposed interchange at Florida’s Turnpike (Mile Marker 234) and Waterlin Boulevard. This study will evaluate a phased approach to interchange implementation. The purpose of this PD&E is to evaluate and provide a new local access connection to accommodate existing and future transportation demand, enhance safety and connectivity between the Turnpike and the planned local roadway network, and improve travel time reliability. This project will also provide additional access to the Turnpike for emergency responders and evacuation operations for surrounding communities.
Phase 1 of the project consists of a northbound entrance ramp from Waterlin Boulevard to SR 91/Turnpike, a southbound exit ramp from SR 91/Turnpike to Waterlin Boulevard, and supporting roadway, drainage, traffic, control, lighting, intelligent transportation services (ITS), signing, utility, and other necessary infrastructure. Phase 2 is anticipated to include future south-facing ramps, consisting of southbound and northbound entrance ramps. The PD&E Study will involve a wide range of engineering assessments, environmental analysis, and public involvement to identify alternatives that meet the project needs.
Waterlin Boulevard Interchange is currently at this stage
The PD&E study for this project is anticipated to be completed by July 2027.
Design
this is an upcoming stage for Waterlin Boulevard Interchange
The design for the Phase 1 ramps is anticipated to be completed by end of 2027. The design for the Phase 2 ramps will be by Florida’s Turnpike Enterprise at a future date when deemed necessary.
Right-of-Way Acquisition
this is an upcoming stage for Waterlin Boulevard Interchange
The right-of-way needed for the Phase 1 ramps is anticipated to be acquired by the County by early to mid-2028. The County will simultaneously preserve the right-of-way needed for the Phase 2 ramps.
Construction
this is an upcoming stage for Waterlin Boulevard Interchange
Construction of the Phase 1 ramps is anticipated to be complete by end of 2029. Construction of the Phase 2 ramps will be by Florida’s Turnpike Enterprise at a future date when deemed necessary.