Simpson Road Phase 1

Share Simpson Road Phase 1 on Facebook Share Simpson Road Phase 1 on Twitter Share Simpson Road Phase 1 on Linkedin Email Simpson Road Phase 1 link

Consultation has concluded - project competed.


This project, which was completed and opened in early September, 2024, four months ahead of schedule, included construction of 10-foot wide sidewalks on both sides of Simpson Road between Myers Road and Boggy Creek Road, a distance of approximately 1.2 miles, to provide a narrower median, 11-foot travel lanes and wider, 10-foot sidewalks.

This Project was designed to coordinate with other improvements to Simpson Road (known as Simpson Road North and South) that are currently in construction south of planned of Osceola Parkway.

The existing bridge on the west of Boggy Terrace Drive was modified to accommodate the new improvements. In addition to new roadway and sidewalk construction, the Project included median width modifications, reconstruction of driveways and drainage modifications.

A new traffic signal was constructed at the intersection of Simpson Road and Ward Road as part of this Project.

Project plans are available on the Documents tab at right. For information on construction alerts, please visit www.osceola.org/go/trafficalerts.

Project Schedule

Click to enlarge



This project, which was completed and opened in early September, 2024, four months ahead of schedule, included construction of 10-foot wide sidewalks on both sides of Simpson Road between Myers Road and Boggy Creek Road, a distance of approximately 1.2 miles, to provide a narrower median, 11-foot travel lanes and wider, 10-foot sidewalks.

This Project was designed to coordinate with other improvements to Simpson Road (known as Simpson Road North and South) that are currently in construction south of planned of Osceola Parkway.

The existing bridge on the west of Boggy Terrace Drive was modified to accommodate the new improvements. In addition to new roadway and sidewalk construction, the Project included median width modifications, reconstruction of driveways and drainage modifications.

A new traffic signal was constructed at the intersection of Simpson Road and Ward Road as part of this Project.

Project plans are available on the Documents tab at right. For information on construction alerts, please visit www.osceola.org/go/trafficalerts.

Project Schedule