Partin Settlement Road Widening

Share Partin Settlement Road Widening on Facebook Share Partin Settlement Road Widening on X (formerly Twitter) Share Partin Settlement Road Widening on Linkedin Email Partin Settlement Road Widening link


This project includes widening and reconstructing Partin Settlement Road from a two-lane to a four-lane roadway, from C.R. 525 (Neptune Road) to Lakeshore Boulevard (approximately 2.7 miles).

Other improvements include:

  • Multi-modal accommodations along the four-lane divided roadway
  • Drainage system and stormwater pond improvements
  • Traffic signal modifications at Neptune Road, Cross Prairie Parkway, U.S. 192, and Lakeshore Boulevard
  • Upgrades to the Intelligent Transportation System (ITS)
  • Modification to the double box bridge culvert over Fish Lake Canal
  • Street lighting and landscape improvements

To stay up to date on Osceola County lane and road closures, please visit: osceolafl.co/TMAS.

Project Schedule



This project includes widening and reconstructing Partin Settlement Road from a two-lane to a four-lane roadway, from C.R. 525 (Neptune Road) to Lakeshore Boulevard (approximately 2.7 miles).

Other improvements include:

  • Multi-modal accommodations along the four-lane divided roadway
  • Drainage system and stormwater pond improvements
  • Traffic signal modifications at Neptune Road, Cross Prairie Parkway, U.S. 192, and Lakeshore Boulevard
  • Upgrades to the Intelligent Transportation System (ITS)
  • Modification to the double box bridge culvert over Fish Lake Canal
  • Street lighting and landscape improvements

To stay up to date on Osceola County lane and road closures, please visit: osceolafl.co/TMAS.