Partin Settlement Road Widening

Share Partin Settlement Road Widening on Facebook Share Partin Settlement Road Widening on Twitter Share Partin Settlement Road Widening on Linkedin Email Partin Settlement Road Widening link

Widening and reconstruction of the current two-lane Partin Settlement Road from CR 525 (Neptune Road) to Lakeshore Boulevard into a four-lane roadway, covering approximately 2.7 miles.

A Part ‘A’ alternatives study was conducted to consider different alignments and Part ‘B’ included the design of a preferred alignment. The study and final design plans can be viewed from the Documents section of this page.

This project includes

  • Construction of a four-lane divided roadway with multi-modal accommodations
  • Improvements to associated drainage systems and storm water ponds
  • Modifications to signalized intersections at Neptune Road, Cross Prairie Parkway, US 192, and Lakeshore Boulevard
  • Upgrades to the Intelligent Transportation System (ITS)
  • Modification / replacement of double box bridge culvert over Fish Lake Canal
  • Street lighting
  • Landscaping considerations

For information on construction alerts, please visit www.osceola.org/go/trafficalerts.

Project Schedule

Widening and reconstruction of the current two-lane Partin Settlement Road from CR 525 (Neptune Road) to Lakeshore Boulevard into a four-lane roadway, covering approximately 2.7 miles.

A Part ‘A’ alternatives study was conducted to consider different alignments and Part ‘B’ included the design of a preferred alignment. The study and final design plans can be viewed from the Documents section of this page.

This project includes

  • Construction of a four-lane divided roadway with multi-modal accommodations
  • Improvements to associated drainage systems and storm water ponds
  • Modifications to signalized intersections at Neptune Road, Cross Prairie Parkway, US 192, and Lakeshore Boulevard
  • Upgrades to the Intelligent Transportation System (ITS)
  • Modification / replacement of double box bridge culvert over Fish Lake Canal
  • Street lighting
  • Landscaping considerations

For information on construction alerts, please visit www.osceola.org/go/trafficalerts.

Project Schedule

Page last updated: 09 May 2024, 01:54 PM