Share Jack Brack Road Extension on FacebookShare Jack Brack Road Extension on X (formerly Twitter)Share Jack Brack Road Extension on LinkedinEmail Jack Brack Road Extension link
This Osceola County project, in partnership with Tavistock Development Company, extended Jack Brack Road from Absher Road to the future south entrance of the Del Webb Sunbridge community. The four-lane roadway extension was constructed in two phases: Phase 1, from Absher Road approximately 3,000 feet east, and Phase 2, from that point another 3,000 feet toward the location of the future Del Webb Sunbridge south entrance.
In addition to new travel lanes, the project included a sidewalk, a 12-foot-wide multiuse recreational trail for pedestrians and cyclists, and major gutter and drainage improvements. Three new stormwater ponds were constructed to reduce flooding and improve water quality by holding and filtering rainwater before it flows into nearby waterways.
Project Schedule
This Osceola County project, in partnership with Tavistock Development Company, extended Jack Brack Road from Absher Road to the future south entrance of the Del Webb Sunbridge community. The four-lane roadway extension was constructed in two phases: Phase 1, from Absher Road approximately 3,000 feet east, and Phase 2, from that point another 3,000 feet toward the location of the future Del Webb Sunbridge south entrance.
In addition to new travel lanes, the project included a sidewalk, a 12-foot-wide multiuse recreational trail for pedestrians and cyclists, and major gutter and drainage improvements. Three new stormwater ponds were constructed to reduce flooding and improve water quality by holding and filtering rainwater before it flows into nearby waterways.
Project Schedule
Page last updated: 15 Jul 2026, 02:16 PM
Open
Jack Brack Road Extension has finished this stage
This consultation is open for contributions.
Under Review
Jack Brack Road Extension has finished this stage
Contributions to this consultation are closed for evaluation and review. The project team will report back on key outcomes.
Final report
Jack Brack Road Extension has finished this stage
The final outcomes of the consultation are documented here. This may include a summary of all contributions collected as well as recommendations for future action.
Construction
Jack Brack Road Extension is currently at this stage