Jack Brack Road Improvements

Share Jack Brack Road Improvements on Facebook Share Jack Brack Road Improvements on X (formerly Twitter) Share Jack Brack Road Improvements on Linkedin Email Jack Brack Road Improvements link

The purpose of this project is to improve the roadway and enhance safety along Jack Brack Road from Narcoossee Road to Absher Road, approximately 2.6 miles.

The proposed improvements include

  • Widening and reconstruction of the roadway into a two-lane divided urban roadway with a raised median and closed drainage system
  • Lowering the speed limit to 35 mph to enhance safety
  • Providing seven-foot buffered bike lanes for cyclists
  • Constructing a 6-foot sidewalk on the north side and a 10-foot shared-use path on the south side
  • Stormwater ponds to manage water runoff
  • Installing a signalized intersection at Zuni Road
  • Street lighting

A signal was recently constructed at the intersection with Narcoossee Road under a separate project, and modifications to the existing signal may be needed.

Project Schedule


The purpose of this project is to improve the roadway and enhance safety along Jack Brack Road from Narcoossee Road to Absher Road, approximately 2.6 miles.

The proposed improvements include

  • Widening and reconstruction of the roadway into a two-lane divided urban roadway with a raised median and closed drainage system
  • Lowering the speed limit to 35 mph to enhance safety
  • Providing seven-foot buffered bike lanes for cyclists
  • Constructing a 6-foot sidewalk on the north side and a 10-foot shared-use path on the south side
  • Stormwater ponds to manage water runoff
  • Installing a signalized intersection at Zuni Road
  • Street lighting

A signal was recently constructed at the intersection with Narcoossee Road under a separate project, and modifications to the existing signal may be needed.

Project Schedule


Page last updated: 21 May 2026, 08:20 AM