Buenaventura Lakes (BVL) Outfall

Share Buenaventura Lakes (BVL) Outfall on Facebook Share Buenaventura Lakes (BVL) Outfall on Twitter Share Buenaventura Lakes (BVL) Outfall on Linkedin Email Buenaventura Lakes (BVL) Outfall link
Buenaventura Lakes Drainage Improvements Alternate Outfall

The proposed BVL Outfall Project will maximize stormwater discharge and create a new positive outfall by constructing dual 8’ x 6’ box culverts and additional canal improvements further upstream to help move the water towards the new outfall. The dual 8’ x 6’ box culverts will convey water from a pond within Buenaventura Lakes to the east side of Simpson Road. A ditch will be constructed from the terminus of the box culverts to the lake. These improvements are anticipated to remove 142 homes from flooding during the modeled 100-year storm event. Design and permit submission is complete. The County is currently seeking federal grant funds for the construction of this project.



The proposed BVL Outfall Project will maximize stormwater discharge and create a new positive outfall by constructing dual 8’ x 6’ box culverts and additional canal improvements further upstream to help move the water towards the new outfall. The dual 8’ x 6’ box culverts will convey water from a pond within Buenaventura Lakes to the east side of Simpson Road. A ditch will be constructed from the terminus of the box culverts to the lake. These improvements are anticipated to remove 142 homes from flooding during the modeled 100-year storm event. Design and permit submission is complete. The County is currently seeking federal grant funds for the construction of this project.



Page last updated: 09 May 2024, 01:48 PM