Buenaventura Boulevard (BVL) Safety Improvements and Complete Streets

Share Buenaventura Boulevard (BVL) Safety Improvements and Complete Streets on Facebook Share Buenaventura Boulevard (BVL) Safety Improvements and Complete Streets on Twitter Share Buenaventura Boulevard (BVL) Safety Improvements and Complete Streets on Linkedin Email Buenaventura Boulevard (BVL) Safety Improvements and Complete Streets link


Public Meeting scheduled for October 15, 2024!

Please click on the Documents tab at right for more information.


Improvements to Buenaventura Boulevard include two separate projects.

The BVL Safety Improvements project is designed to improve safety along the corridor, from Florida Parkway to Osceola Parkway, a distance of approximately 1.4 miles. The project will be designed in accordance with a safety study of the corridor conducted in 2020 by the Florida Department of Transportation. The project includes:

  • Roadway improvements
  • Signalization improvements
  • Improved access for pedestrians, bicyclists and motorists

The BVL Complete Streets project comprises the second phase of planned improvements, from Simpson Road to Osceola Parkway, a distance of approximately 2.4 miles. This project aims to reduce vehicular speeds and includes:

  • Construction of two roundabouts at Trotter’s Circle and Florida Parkway
  • A 12-foot wide shared use path
  • Additional flashing beacons for pedestrian crossings, among other amenities


Project Schedule



Public Meeting scheduled for October 15, 2024!

Please click on the Documents tab at right for more information.


Improvements to Buenaventura Boulevard include two separate projects.

The BVL Safety Improvements project is designed to improve safety along the corridor, from Florida Parkway to Osceola Parkway, a distance of approximately 1.4 miles. The project will be designed in accordance with a safety study of the corridor conducted in 2020 by the Florida Department of Transportation. The project includes:

  • Roadway improvements
  • Signalization improvements
  • Improved access for pedestrians, bicyclists and motorists

The BVL Complete Streets project comprises the second phase of planned improvements, from Simpson Road to Osceola Parkway, a distance of approximately 2.4 miles. This project aims to reduce vehicular speeds and includes:

  • Construction of two roundabouts at Trotter’s Circle and Florida Parkway
  • A 12-foot wide shared use path
  • Additional flashing beacons for pedestrian crossings, among other amenities


Project Schedule